Çameli Huntit Project

Çameli Huntit Project is located in Çameli, Denizli and focuses on Huntite • Hydromagnesite. The current development stage is Industrial mineral development.

City / LocationÇameli, Denizli
Mineral TypeHuntite • Hydromagnesite
Project StageIndustrial mineral development
Industrial licences2
Total area2.622,97 ha
Average deposit thickness~5 m

Project Summary

Çameli Huntit Project is a mining project located in Çameli, Denizli. Its technical programme focuses on Huntite • Hydromagnesite and is currently classified as Industrial mineral development.

The project is evaluated through field observations, historical data, laboratory analyses, infrastructure conditions and staged technical studies. Resource, reserve and investment decisions will be based on verified data produced during the next work phases.

Location and Access

  • Project location: Çameli, Denizli.
  • Access, infrastructure and logistics conditions are assessed together with the planned field programme.
  • Detailed transport and site arrangements will be updated as technical studies advance.

Geology and Technical Data

Geological work focuses on the distribution, continuity, quality and structural controls of Huntite • Hydromagnesite.

Available field observations and historical data will be validated through mapping, sampling, analysis and, where required, drilling.

Highlights

  • Strategic location in Çameli, Denizli
  • Focus on Huntite • Hydromagnesite
  • Staged and verifiable technical programme
  • Infrastructure, environmental and economic evaluation

Analysis Results

ParameterResultData Context
MgO%46,59Available project or historical data
CaO%1,24Available project or historical data
SiO₂%0,071Available project or historical data
Loss on ignition (1,000°C)%50,28Available project or historical data

Work Roadmap

01

Data validation

Compile and verify historical records, maps, samples and field observations.

02

Field programme

Complete mapping, sampling, geophysics and drilling according to the project stage.

03

Resource model

Build an auditable three-dimensional geological and quality model.

04

Technical evaluation

Review processing, infrastructure, environmental and economic alternatives together.

Published figures are based on available company presentations and historical studies. They do not constitute a current certified mineral resource or reserve statement.