Kurtoğlu Madencilik San. ve Tic. A.Ş.
ENEnglish

Doğu Karadeniz · 04

Kelkit Polimetal Project

Kelkit Polimetal Project is located in Kelkit, Gümüşhane and focuses on Cu • Pb • Zn • Au • Ag. The current development stage is Exploration + operating licences.

City / LocationKelkit, Gümüşhane
Mineral TypeCu • Pb • Zn • Au • Ag
Project StageExploration + operating licences
Mining licences6
Total area8.695,18 ha
Operating + exploration3 + 3

Project Summary

Kelkit Polimetal Project is a mining project located in Kelkit, Gümüşhane. Its technical programme focuses on Cu • Pb • Zn • Au • Ag and is currently classified as Exploration + operating licences.

The project is evaluated through field observations, historical data, laboratory analyses, infrastructure conditions and staged technical studies. Resource, reserve and investment decisions will be based on verified data produced during the next work phases.

Location and Access

  • Project location: Kelkit, Gümüşhane.
  • Access, infrastructure and logistics conditions are assessed together with the planned field programme.
  • Detailed transport and site arrangements will be updated as technical studies advance.

Geology and Technical Data

Geological work focuses on the distribution, continuity, quality and structural controls of Cu • Pb • Zn • Au • Ag.

Available field observations and historical data will be validated through mapping, sampling, analysis and, where required, drilling.

Highlights

  • Strategic location in Kelkit, Gümüşhane
  • Focus on Cu • Pb • Zn • Au • Ag
  • Staged and verifiable technical programme
  • Infrastructure, environmental and economic evaluation

Analysis Results

ParameterResultData Context
Lead (Pb)%18,44’e kadarAvailable project or historical data
Zinc (Zn)%14,95’e kadarAvailable project or historical data
Silver (Ag)179 g/t’ye kadarAvailable project or historical data
Gold (Au)6,19 g/t’ye kadarAvailable project or historical data

Work Roadmap

01

Data validation

Compile and verify historical records, maps, samples and field observations.

02

Field programme

Complete mapping, sampling, geophysics and drilling according to the project stage.

03

Resource model

Build an auditable three-dimensional geological and quality model.

04

Technical evaluation

Review processing, infrastructure, environmental and economic alternatives together.

Published figures are based on available company presentations and historical studies. They do not constitute a current certified mineral resource or reserve statement.
W