Project Summary
Üzümcü Zn-Pb Project is a mining project located in Hakkari ve Şırnak. Its technical programme focuses on Zinc • Lead • Polymetallic and is currently classified as Operating licence + advanced exploration.
The project is evaluated through field observations, historical data, laboratory analyses, infrastructure conditions and staged technical studies. Resource, reserve and investment decisions will be based on verified data produced during the next work phases.
Location and Access
- Project location: Hakkari ve Şırnak.
- Access, infrastructure and logistics conditions are assessed together with the planned field programme.
- Detailed transport and site arrangements will be updated as technical studies advance.
Geology and Technical Data
Geological work focuses on the distribution, continuity, quality and structural controls of Zinc • Lead • Polymetallic.
Available field observations and historical data will be validated through mapping, sampling, analysis and, where required, drilling.
Highlights
- Strategic location in Hakkari ve Şırnak
- Focus on Zinc • Lead • Polymetallic
- Staged and verifiable technical programme
- Infrastructure, environmental and economic evaluation
Analysis Results
| Parameter | Result | Data Context |
|---|---|---|
| Zinc (Zn) | %22,10 | Available project or historical data |
| Lead (Pb) | %8,20 | Available project or historical data |
| Iron (Fe) | %7,80 | Available project or historical data |
| Silica (SiO₂) | %5,70 | Available project or historical data |
Work Roadmap
Data validation
Compile and verify historical records, maps, samples and field observations.
Field programme
Complete mapping, sampling, geophysics and drilling according to the project stage.
Resource model
Build an auditable three-dimensional geological and quality model.
Technical evaluation
Review processing, infrastructure, environmental and economic alternatives together.