Kurtoğlu Madencilik San. ve Tic. A.Ş.
ENEnglish

Doğu Anadolu · 06

Üzümcü Zn-Pb Project

Üzümcü Zn-Pb Project is located in Hakkari ve Şırnak and focuses on Zinc • Lead • Polymetallic. The current development stage is Operating licence + advanced exploration.

City / LocationHakkari ve Şırnak
Mineral TypeZinc • Lead • Polymetallic
Project StageOperating licence + advanced exploration
Mining licences14
Total area23.978,78 ha
Operating + advanced exploration1 + 13

Project Summary

Üzümcü Zn-Pb Project is a mining project located in Hakkari ve Şırnak. Its technical programme focuses on Zinc • Lead • Polymetallic and is currently classified as Operating licence + advanced exploration.

The project is evaluated through field observations, historical data, laboratory analyses, infrastructure conditions and staged technical studies. Resource, reserve and investment decisions will be based on verified data produced during the next work phases.

Location and Access

  • Project location: Hakkari ve Şırnak.
  • Access, infrastructure and logistics conditions are assessed together with the planned field programme.
  • Detailed transport and site arrangements will be updated as technical studies advance.

Geology and Technical Data

Geological work focuses on the distribution, continuity, quality and structural controls of Zinc • Lead • Polymetallic.

Available field observations and historical data will be validated through mapping, sampling, analysis and, where required, drilling.

Highlights

  • Strategic location in Hakkari ve Şırnak
  • Focus on Zinc • Lead • Polymetallic
  • Staged and verifiable technical programme
  • Infrastructure, environmental and economic evaluation

Analysis Results

ParameterResultData Context
Zinc (Zn)%22,10Available project or historical data
Lead (Pb)%8,20Available project or historical data
Iron (Fe)%7,80Available project or historical data
Silica (SiO₂)%5,70Available project or historical data

Work Roadmap

01

Data validation

Compile and verify historical records, maps, samples and field observations.

02

Field programme

Complete mapping, sampling, geophysics and drilling according to the project stage.

03

Resource model

Build an auditable three-dimensional geological and quality model.

04

Technical evaluation

Review processing, infrastructure, environmental and economic alternatives together.

Published figures are based on available company presentations and historical studies. They do not constitute a current certified mineral resource or reserve statement.
W