Vaysal CaF₂ & Pb Project

Vaysal CaF₂ & Pb Project is located in Lalapaşa, Edirne and focuses on Fluorite • Lead • Silver. The current development stage is Advanced exploration.

City / LocationLalapaşa, Edirne
Mineral TypeFluorite • Lead • Silver
Project StageAdvanced exploration
Exploration licences2
Total area1.614,62 ha
Historical drill holes28

Project Summary

Vaysal CaF₂ & Pb Project is a mining project located in Lalapaşa, Edirne. Its technical programme focuses on Fluorite • Lead • Silver and is currently classified as Advanced exploration.

The project is evaluated through field observations, historical data, laboratory analyses, infrastructure conditions and staged technical studies. Resource, reserve and investment decisions will be based on verified data produced during the next work phases.

Location and Access

  • Project location: Lalapaşa, Edirne.
  • Access, infrastructure and logistics conditions are assessed together with the planned field programme.
  • Detailed transport and site arrangements will be updated as technical studies advance.

Geology and Technical Data

Geological work focuses on the distribution, continuity, quality and structural controls of Fluorite • Lead • Silver.

Available field observations and historical data will be validated through mapping, sampling, analysis and, where required, drilling.

Highlights

  • Strategic location in Lalapaşa, Edirne
  • Focus on Fluorite • Lead • Silver
  • Staged and verifiable technical programme
  • Infrastructure, environmental and economic evaluation

Analysis Results

ParameterResultData Context
Silver (Ag)239 g/tAvailable project or historical data
Gold (Au)0,4 g/tAvailable project or historical data
Vertical vein4 mAvailable project or historical data
Horizontal cores2,8 m / 3 mAvailable project or historical data

Work Roadmap

01

Data validation

Compile and verify historical records, maps, samples and field observations.

02

Field programme

Complete mapping, sampling, geophysics and drilling according to the project stage.

03

Resource model

Build an auditable three-dimensional geological and quality model.

04

Technical evaluation

Review processing, infrastructure, environmental and economic alternatives together.

Published figures are based on available company presentations and historical studies. They do not constitute a current certified mineral resource or reserve statement.